North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.

Residential Complex at North Station Vienna
Vienna, Austria

Two residential buildings each with 8 storeys, with a total of 91 housing units on the area of the former North Station in Vienna

Walls, columns and slabs constructed using in-situ concreting operations

 

 

Location
Main Application
Low- and Mid-Rise Buildings
Project participants
Customer: Universale Hochbau, Trumau

The Project

Impressions from the project process
1 /
5
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.

Project Information

Requirements
Architecturally elaborate balcony facade Architectural concrete requirements for walls and undersides of the balconies Tight schedule of only 10 months for the building shell

Solutions
Formwork solution for walls, slabs and balcony cantilevers with well thought-out cycle planning MAXIMO panel formwork for architectural concrete walls for a clearly defined joint and tie arrangement and a 25% time advantage for forming the walls (on-site material requirements 800 m² SKYDECK for storey slabs - working without time-consuming use of a crane, with easy handling and early striking with the drophead system for forming the slabs (on-site material requirements 2,200 m²) Cantilevered slab formwork with simultaneous utilization as work scaffold

Customer benefits
Architectural concrete walls with clearly arranged joint and tie pattern
Compliance with the tight construction schedule
Very manageable on-site material requirements

Jürgen Pischof, Site Manager
Jürgen Pischof, Site Manager
Jürgen Pischof
Site Manager
With SKYDECK, we have exactly the right slab formwork system for our construction project – the drophead for early striking as well as the simple and easy handling have really convinced us. And the MAXIMO wall formwork is 25 per cent faster than conventional panel formwork systems; the one-sided anchoring in particular saves a great deal of time.

Related Products

Are you working on a project like this?

Call us on +966 (0) 11 230 0655 to discuss your requirements further.
Location

Residential Complex at North Station Vienna, Austria

North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.